Tear-off and architectural shingles
Everything up to the dry-in is on this page. Shingles wait until the roof is dry.
Flashing
Delayed
Rain through Thursday. Dry-in stays covered. Shingles start Friday morning.
14 Birch Ave. The leak was photographed inside and on the roof before anything came off. Decking is patched and the dry-in is down. Shingles go on after the rain.
Questions & Comments
Contact the provider directly
Was that stain already in the attic, or did it start when you pulled the shingles?
The ceiling and attic photos are from Monday, before we climbed. The valley photo is from the same morning, shingles still on. The stain was already there.
Are we open to the rain tonight?
No. Dry-in is down: drip edge, ice and water, and underlayment. The underlayment photo is on Dry-in. Shingles start Friday if it stays dry.
This is a demo job. Comments are disabled in the showcase.
Contact
Job updates by Opeo - get your own free job link